Monday, August 27, 2007

Get Wet While Brazillian Waxed



formation phase block of styrofoam

phase of this operation takes place in a closed mold with steam. Moulded block Polystyrene is formed from the porous structure of microcellular plastics. Foamed polystyrene Owipan pre-seasoned and pneumatically transferred to the tank naporowego invested over form. Such a location of the tank allows us to gravity fill the chamber forms an intermediate styrofoam. After filling, tightly close the form and its content is subjected to steaming at a pressure of from 0.4 to 1.0 MPa, while the duration of the operation usually takes between 12 to 15 minutes. This time is needed to create the block. Time control and maintain the pressure at the open valves childbearing on average between 10 - 20 seconds after which closes the steam supply valve.

Basic EPS block molding phase requires the following steps:

  1. warming Styrofoam forms - matrix
  2. lubrication aluminum plates form;
  3. Styrofoam mold filling;
  4. blowing mold is filled;
  5. proper formation;
  6. removing the molded block .

0 comments:

Post a Comment